McLaughlin Science Hall 2020-2021
https://archives.sac.on.ca/link/descriptions11470
- Type
- Photograph
- Subjects
- McLaughlin Science Hall
- Description
- 2020-2021
- Scope and Contents
- McLaughlin Science Hall corridor second floor corridor.Newly opened February 2021 Opened in Febrary 2021 (following 18 months of construction), as students returned to in-person learning following a second pandemic lockdown in Ontario.The new McLaughlin Hall building offers bright, spacious, flexible classrooms and laboratories filled with leading-edge technology and high-tech equipment. With six breakout rooms, the main floor is a place of collaboration, learning, and sharing; and in the spirit of “doing,” the two-storey maker space allows students to bring ideas to life.
- Storage Location
- I:drive
- Type
- Photograph
- Subjects
- McLaughlin Science Hall
- Description
- 2020-2021
- Scope and Contents
- McLaughlin Science Hall corridor second floor corridor.Newly opened February 2021 Opened in Febrary 2021 (following 18 months of construction), as students returned to in-person learning following a second pandemic lockdown in Ontario.The new McLaughlin Hall building offers bright, spacious, flexible classrooms and laboratories filled with leading-edge technology and high-tech equipment. With six breakout rooms, the main floor is a place of collaboration, learning, and sharing; and in the spirit of “doing,” the two-storey maker space allows students to bring ideas to life.
- Storage Location
- I:drive